conceptual infrastructure planning · september 2026

geminus

The whole design. In three dimensions.

Step inside the model.
Inspect the rack. Follow the systems.

LIVE 3D VIEW / NATIVE VIEWPORT CROP
The whole 3D building concept
NATIVE PANEL DETAIL

The whole 3D building concept

Native viewport crop from 34-building-3d-overview-context.jpg, showing the real authored concept geometry. Provisional room/equipment arrangement, not constructed BIM, OEM CAD, a commissioned twin or proof of capacity.

Capture & source context

Data-center twins / Avon Labs · live NVIDIA OpenUSD viewport. Authored concept or source-dimensioned equipment geometry; no manufacturer CAD, verified installation fit or operating performance.

Native panel crop. Full application context ↗

Captured 2026-10-16T22:23:22.845Z.

Full application context ↗
Concept & source scope

Authored concept geometry · Hypothetical planning. Source-selected equipment record envelopes remain distinct.

Native screenshot of the authored B01 building concept. Full application context is attached; source-selected saved designs are shown in the equipment chapters below.

B01 building concept · Live NVIDIA viewport · Full application context attachedAUTHENTIC APPLICATION / October 16, 2026, America/New_YorkHypothetical planning · Source conditions retained

A CLOSER LOOK / THE LIVE APPLICATION

Equipment, in view.

THE NATIVE 3D VIEWPORT

Understand the room.
Then get closer.

See the arrangement before the individual record. These actual NVIDIA-rendered B01 views put rack rows, schematic cooling and power equipment in the same spatial context.

A closer look at the rack rows
NATIVE PANEL DETAIL

A closer look at the rack rows

Sixteen schematic rack enclosures. Inspect rows, aisle containment and nearby cooling in the authored B01 building concept.

Capture & source context

Data-center twins / Avon Labs · live NVIDIA OpenUSD viewport. Authored concept or source-dimensioned equipment geometry; no manufacturer CAD, verified installation fit or operating performance.

Native panel crop. Full application context ↗

Captured 2026-10-16T22:23:13.991Z.

A system view of cooling and power
NATIVE PANEL DETAIL

A system view of cooling and power

Cooling and power share one view. Inspect the schematic equipment arrangement beside rack rows and the outdoor plant yard. Routing remains a concept.

Capture & source context

Data-center twins / Avon Labs · live NVIDIA OpenUSD viewport. Authored concept or source-dimensioned equipment geometry; no manufacturer CAD, verified installation fit or operating performance.

Native panel crop. Full application context ↗

Captured 2026-10-16T22:23:32.160Z.

EVIDENCE BOUNDARYThese B01 concept models use schematic equipment and provisional assumptions. They are distinct from the source-selected saved revisions and reference-building planner shown below. Geometry does not establish approved installation or operating performance.

NATIVE DETAIL / SAVED MODULAR-LIQUID REVISION

Two envelopes.
Two exact identities.

Focused native crops of the GPU-rack and CDU exterior bodies. Their parent frames retain the selected instance, source fields and saved-revision identity.

The source-sized GPU-rack body
NATIVE PANEL DETAIL

The source-sized GPU-rack body

HPE GB200 NVL72 / exterior only. A native crop from the saved design. Internal 72-GPU/36-CPU architecture is a documentary fact, not modeled geometry.

Capture & source context

Data-center twins / Avon Labs · live NVIDIA OpenUSD viewport. Authored concept or source-dimensioned equipment geometry; no manufacturer CAD, verified installation fit or operating performance.

Native panel crop. Full application context ↗

Captured 2026-10-16T22:27:23.635Z.

The CDU source envelope
NATIVE PANEL DETAIL

The CDU source envelope

XDU450 / source-sized exterior. Native crop of the selected historic brochure body. No OEM internals, connector placement or installed cooling result is implied.

Capture & source context

Data-center twins / Avon Labs · live NVIDIA OpenUSD viewport. Authored concept or source-dimensioned equipment geometry; no manufacturer CAD, verified installation fit or operating performance.

Native panel crop. Full application context ↗

Captured 2026-10-16T22:24:52.936Z.

EVIDENCE BOUNDARYThese exterior envelopes belong to the separate 55-body modular-liquid revision, not the B01 building concept. Internal GPU layout, OEM connector placement, engineering compatibility and installed performance are not modeled or established.

RACKS / EXACT PHYSICAL INSTANCES

Know the rack.
Know what is assumed.

Two different rack records, two explicit scopes. Inspect the HPE GB200 NVL72 exterior and retained saved-instance facts, then read the APC AR3100B2 enclosure dossier. Internal GPU geometry, cabinet dimensions and mounting units remain distinct.

HPE / saved instance
80 kWExplicit IT-load assumption; not measured consumption or a validated operating point.
HPE / published mass
1,471.9 kgApproximate fully loaded PGW source mass; configuration-dependent, not bare-cabinet mass.
APC / mounting units
42UAR3100B2 enclosure source field; separate from the HPE complete compute rack.
The GPU rack, located in the saved design
LIVE 3D + RETAINED RECORD

The GPU rack, located in the saved design

The rack has an exact source. The HPE GB200 NVL72 exterior retains its published dimensions and configuration-dependent mass. The 80 kW input is a declared planning assumption.

Capture & source context

Data-center twins / Avon Labs · live NVIDIA OpenUSD viewport. Authored concept or source-dimensioned equipment geometry; no manufacturer CAD, verified installation fit or operating performance.

Captured 2026-10-16T22:27:23.635Z.

AR3100B2 — the equipment dossier
LIVE APPLICATION

AR3100B2 — the equipment dossier

AR3100B2 / a separate enclosure record. Manufacturer-linked dimensions and 42U mounting field. Mass, price, lead time and availability remain unknown.

Capture & source context

geminus live asset library; APC / Schneider Electric manufacturer reference se-ar3100b2; revision1 reviewed October 9, 2026.

Captured 2026-10-16T21:59:14.130Z.

EVIDENCE BOUNDARYThe HPE view belongs to frozen modular-liquid revision 1. The APC dossier is a separate equipment-library record. Neither source geometry nor mounting-unit count establishes installed fit, workload throughput, price or availability.

COOLING / BODY + SOURCE CONDITIONS

Read the rating.
Keep the conditions.

The native XDU450 exterior and its historical brochure record belong together. Follow the exact equipment identity, dimensions, dry-mass definition and published rating condition into the source dossier.

Historic brochure / XDU450
453 kWNominal published rating at the stated source point; not a facility cooling result.
Published condition
4 °CApproach temperature difference. Fluid, flow and configuration conditions remain attached.
Brochure dry mass
370 kgExcludes operating fluid and shipping. Installed suitability remains unresolved.
XDU450 in 3D, with the exact record
LIVE 3D + RETAINED RECORD

XDU450 in 3D, with the exact record

One exact CDU. One retained source. Inspect the historic XDU450 brochure envelope and its 370 kg dry-mass definition together.

Capture & source context

Data-center twins / Avon Labs · live NVIDIA OpenUSD viewport. Authored concept or source-dimensioned equipment geometry; no manufacturer CAD, verified installation fit or operating performance.

Captured 2026-10-16T22:24:52.936Z.

453 kW — with its stated temperature approach
LIVE APPLICATION

453 kW — with its stated temperature approach

453 kW at 4 °C approach. The historic brochure rating keeps its stated fluid and flow conditions. It is not a facility cooling result.

Capture & source context

geminus live asset library; Vertiv Liebert XDU brochure page3, technical specifications, accessed October 9, 2026.

Captured 2026-10-16T21:59:43.535Z.

EVIDENCE BOUNDARYThe nominal 453 kW brochure value is published at 4 °C approach under stated source conditions. It does not establish facility cooling performance, a compatible full loop or a current product configuration.

ELECTRICAL / EXACT CONFIGURATION

Inspect the cabinet.
Verify the configuration.

Inspect the Galaxy VS GVSUPS100KHS physical envelope alongside its retained external-battery, non-N+1 configuration and exact source edition. Published facts keep their electrical and operating conditions.

Exact retained model
GVSUPS100KHSGalaxy VS external-battery, non-N+1 configuration; other variants are separate.
Source equipment mass
250 kgSelected technical-specification row; shipping and external batteries excluded.
Installation evidence
UnresolvedBattery applicability, protection, runtime and usable installed capacity require review.
Inspect the UPS as a physical model
LIVE 3D + RETAINED RECORD

Inspect the UPS as a physical model

GVSUPS100KHS. A source-sized Galaxy VS UPS envelope, kept with its non-N+1 external-battery configuration and equipment-only mass.

Capture & source context

Data-center twins / Avon Labs · live NVIDIA OpenUSD viewport. Authored concept or source-dimensioned equipment geometry; no manufacturer CAD, verified installation fit or operating performance.

Captured 2026-10-16T22:26:54.530Z.

Exact model. Explicit electrical conditions.
NATIVE PANEL DETAIL

Exact model. Explicit electrical conditions.

The conditions stay attached. Review the exact model, published AC conditions and retained source edition. Battery applicability and runtime remain unresolved.

Capture & source context

Data-center twins / Avon Labs · live NVIDIA OpenUSD viewport. Authored concept or source-dimensioned equipment geometry; no manufacturer CAD, verified installation fit or operating performance.

Native panel crop. Full application context ↗

Captured 2026-10-16T22:25:33.315Z.

EVIDENCE BOUNDARYEquipment mass excludes external batteries and shipping. Battery applicability, DC protection, runtime, usable installed capacity and approval of the connected lineup remain unresolved.

THE PLANNING REVIEW

See the arrangement.
Keep the open questions.

Move from the three-dimensional concept to the separate source-selected planning view. Room allocations, equipment schedules, mismatched published conditions and unresolved engineering checks remain visible.

Source-sized equipment, assumed rooms
LIVE APPLICATION

Source-sized equipment, assumed rooms

The layout has a ledger. Follow the four HPE rack envelopes, two CDUs and supporting equipment into the schedule. Room and service allocations remain hypothetical.

Capture & source context

Data-center twins / Avon Labs. Source-dimensioned planning models and explicit assumptions; not OEM CAD, live operations, commissioned performance or engineering approval.

Captured 2026-10-16T21:54:52.793Z.

Documented mismatches stay visible
LIVE APPLICATION

Documented mismatches stay visible

Known mismatches remain visible. Published electrical and water-rating differences stay in the review. Overall compatibility remains unresolved.

Capture & source context

Data-center twins / Avon Labs. Source-dimensioned planning models and explicit assumptions; not OEM CAD, live operations, commissioned performance or engineering approval.

Captured 2026-10-16T21:54:35.231Z.

EVIDENCE BOUNDARYThis planner comparison assumes equal 320 kW IT demand. Equal electric demand does not establish equal computing performance, compatible plant or an approved building design.

CONNECTED BUILDING-AIR / THE LOAD LEDGER

Trace every watt.
Keep the assumptions.

A separate connected building-air example makes its instance inventory, declared loads and equations inspectable. The total follows the stated assumptions; unknowns and failed checks remain part of the review.

Building-air / assumed IT
38.4 kWEight racks and 64 explicit servers in this separate connected example.
Steady-state arithmetic
52.6 kW38.4 IT + 1.6 UPS loss + 9.6 cooling + 3 other; not measured consumption or annual PUE.
Review findings
127 + 7Unknown + failed checks. A spatial pass is not engineering approval.
An equipment ledger behind the plan
LIVE APPLICATION

An equipment ledger behind the plan

86 instances. 8 racks. 64 explicit servers. The connected building-air example retains 127 unknown and 7 failed checks. Spatial pass; engineering unresolved.

Capture & source context

Data-center twins / Avon Labs. Source-dimensioned planning models and explicit assumptions; not OEM CAD, live operations, commissioned performance or engineering approval.

Captured 2026-10-16T21:54:07.962Z.

Declared loads, visible equations
LIVE APPLICATION

Declared loads, visible equations

52.6 kW, with the arithmetic visible. Explicit steady-state assumptions add IT, UPS loss, cooling and other load. This is not operating telemetry or annual PUE.

Capture & source context

Data-center twins / Avon Labs. Source-dimensioned planning models and explicit assumptions; not OEM CAD, live operations, commissioned performance or engineering approval.

Captured 2026-10-16T21:54:12.401Z.

EVIDENCE BOUNDARYKeep example identities separate: this 86-body building-air review is not the 55-body saved modular-liquid revision, the 320 kW B01 concept, or the four-HPE-rack planner.

THE RECORDED INVENTORY

LIVE INVENTORY / 16 OCTOBER 2026
86

Equipment and component records

Distinct catalog IDs; includes four original generic building components. 82 equipment records are source checked; that does not establish installed suitability.

Counting basis ↗
773

Populated technical property entries

570 catalog properties plus 203 profile facts. Repeated facts remain retained; unknown fields excluded.

Counting basis ↗
8

Editable design examples

Rack, module and building/modular examples; paired form factors intentionally reuse geometry. Hypothetical, with installation unresolved.

Counting basis ↗
140

Distinct external source URLs

Exact external URL union across nine core source, drawing and research registers; different URLs can refer to the same document edition.

Counting basis ↗

Distinct units and overlapping inventories. These figures are not operating capacity or a combined count of proprietary data points.

THE REVIEW BOUNDARY

A clearer concept.
A better next question.

These views show a planning and evidence workbench. They support careful review of declared assumptions and source facts.

  • Hypothetical planning. The B01 concept uses authored schematic geometry; saved revisions use source-sized equipment envelopes. Manufacturer internal CAD, approved installation fit and verified operating performance are not established.
  • B01’s 16 schematic racks and 320 kW provisional IT are distinct from the saved building-air reference (8 racks, 64 servers, 38.4 kW assumed IT), saved modular-liquid reference (55 bodies, 6 racks, 32 servers, 179.2 kW assumed IT), and source-selected planner. Counts and loads are not interchangeable.
  • Published ratings retain exact model, edition, fluid, temperature, configuration and electrical conditions. Battery runtime, complete cooling-loop compatibility, protection and commissioning remain open.
  • Standalone workbench. No Atlas, parcel or geography integration is implied.
Sources, dates & counting definitions

Edition 02 adds 14 authentic live views of native 3D models and equipment evidence to 12 preserved Edition 01 originals. Native viewport crops retain full application context and original bitmap dimensions. The B01 authored concept, frozen source-sized designs and source-selected 2D planner are separate examples; no site integration, live operating telemetry, manufacturer CAD, commissioning or engineering approval is claimed.

  • Platform Metrics and counting definitions

    Live inventory refreshed October 16; deployed revision cd484cec4c2f, October 13.

  • Connected designs
  • Reference-building planner
  • B01 concept basis and layout

    Authored conventional-building concept with provisional operating assumptions.

  • Frozen modular-liquid revision1 in the native viewer

    Exact retained record identity; frozen evidence is not recalculated from later source updates.

  • Native saved-design inspection method

    Physical-body, identity, camera, source and assumption-overlay contract.

AVON LABS / geminus

Get closer
to the design.